Dark | Light
[GUEST ACCESS MODE: Data is scrambled or limited to provide examples. Make requests using your API key to unlock full data. Check https://lunarcrush.ai/auth for authentication information.]

![aonanuga1956 Avatar](https://lunarcrush.com/gi/w:24/cr:twitter::80610492.png) Bayo Onanuga [@aonanuga1956](/creator/twitter/aonanuga1956) on x 118.6K followers
Created: 2025-07-25 23:01:46 UTC

"President Tinubu is committed to developing every part of the country with fairness and equity" ---Minister of Works, Dave Umahi replies to Kwankwaso

STATEMENT OF SEN. KWANKWASO THAT THE NORTH IS MARGINALIZED ON ROAD INFRASTRUCTURE DEVELOPMENT UNDER PRESIDENT TINUBU’S ADMINISTRATION, ABSOLUTELY FALSE, MISLEADING AND SELF-SERVING.
 
My attention as Honourable Minister of Works has been drawn to the unfortunate statement by His Excellency, Sen. Kwankwaso that President Bola Ahmed Tinubu, GCFR, is developing more roads in the South than in the North.
 
X. I consider this statement as a grave misleading information made intentionally to deceive our brothers and sisters in the North and to pretend that he loves the North more than any other leader from the North. I consider  Sen. Kwankwaso’s statement as statement made out of desperation and as part   of his struggle  with few others who believe that they can inherit the impeccable legacy of our dear late President  Mohammadu Buhari, GCFR and that the only way available for them  towards achieving same  is to be divisive and pretentious. Trying to be  like  our late President Buhari cannot be a job of three decades and  can not be done with deceit. I think our younger generation has such a chance and  which must be worked for through hard work, honesty, transparency and commitment to the unity of our country , a legacy that our late President Buhari, GCFR achieved in all his life on earth. May God continue to bless his legacies and give him a peaceful rest, Amen 
 
X. For the interest of all Nigerians, especially  our  dear brothers and sisters in the North, I wish to highlight  just a few key ongoing projects in each of the six Geo-Political Zones. 
 
X. The four legacy projects of President Bola Ahmed Tinubu, GCFR:
a) Lagos-Calabar Coastal Highway, which is XXX km: As of today, a total of XXX km is ongoing within Lagos State and XX km within Cross River and Akwa Ibom States. The total ongoing is XXX km  by X lanes or XXX km by X lanes in the South.
b) The Sokoto-Badagry  Superhighway, which is 1068km: As of today, we have XXX km ongoing at Kebbi section and XXX km ongoing at Sokoto section. Total ongoing is XXX km  by X lanes or XXX km by X lanes in the North.
c) Trans Sahara road spanning through Cross River - Ebonyi - Benue - Kogi - Nasarawa - Abuja, which is 465km: XXX km  by X lanes or XX km by X lanes is ongoing in Ebonyi State - South.
d) Akwanga - Jos - Bauchi – Gombe road, which is 439km: Project is being redesigned from flexible pavement to rigid pavement for more durable pavement as directed by Mr. President and to conform to the other legacy projects. In the four legacy projects, the North has XX% and South 48%. Within the ongoing projects as of today, the South has XXX km by 3lanes and the North has  756km by X lanes . The facts are there. I wonder why people don’t talk about other legacy projects of Mr. President but will always dwell on Lagos-Calabar Coastal Highway. This road has only XXX km by X lanes in Lagos State that is ongoing  now , crossriver and Akwaibom has 130km by X lanes that is ongoing whereas kebbi alone has XXX km  by X lanes that is ongoing. Sokoto has XXX km by X lanes that  is ongoing.   I think Sen.  Kwankwaso is not fair to Mr.President and the unity of our country 
 
X. The following major projects are  also ongoing in the North.
a)  Sokoto - Zamfara - Katsina - Kaduna road: This is XXX km dualized (750 km), costing about ₦824 Billion. This project is being handled by CBC, Triacta, Setraco, and Mothercat. Projects are ongoing mostly on reinforced concrete pavement. Despite the insecurity within this corridor, work is ongoing.
b) Abuja - Kaduna - Kano road: XXX km dualized  (700km) project is being  constructed on concrete pavement with a total sum of ₦764 Billion with Infiouest Nig Ltd and XX% of the contract sum already paid and work is ongoing.
c)  BUA Tax Credit  road passing through Jigawa, Katsina, and Kano States: XXX km dualized (512 km). Project redesigned and constructed on rigid pavement.
d)  XXX km of Zaria - Hunkuyi road is being constructed by mothercat Nig Ltd.
e) The Kano Northern Bypass: XX km is being constructed by CCECC.
f)  The XXXXX km dualized (201.8 km) Kano - Jigawa road is being constructed by Triacta.
g) The Bama and Dikwa roads (49+51= XXX km) by Dangote Tax Credit are ongoing in Borno State 
h) The  Borno  Ring Road: XXX km is being constructed by CCECC.
i)  The XX km Malando road in Kebbi State is being constructed by Episolyn Nig Ltd.
j) The XXX km dualized (500 km) Benue to 9th Mile road costing $XXX Million by China Harbour is ongoing.
k) The dualization of Lokoja - Okene 86km dualized (172km) by CGC is ongoing. 
l) The sections X and X of Kaduna to Katsina roads by CCECC costing about ₦150 Billion is ongoing.
 
X. Major ongoing projects in the South: 
a) Completion of Lagos - Ibadan XXX km costing ₦33 Billion by RCC.
b)  completion of Lagos to Sagamu XX km dualized (24 km) and  flyovers by CBC costing 
c)  completion of Oyo - Ogbomoso  to Ilorin  Road costing ₦146 Billion by JRB 
d) Repairs of Carter bridge, Third Mainland bridge, Eko bridge with total contract sum of about ₦120 Billion

e) In South East, we have:
   i.  Completion of Enugu - Onitsha road by MTN tax credit which is XXX km costing ₦202 Billion.
ii.  Completion of Enugu - Onitsha  road by CBC, which is XX km costing ₦150 Billion. 
  iii. Enugu - Abakaliki   XX km road by reinforced global resources 
iv) 2nd Niger bridge  access road in Anambra State, XXXX km dualized with many bridges and  flyovers - ₦175Billion by CGC            Vii ) the completion of 61km  dualized of lokpanta in Imo state to Enugu state by CGC costing 100bn 

f.) In South - South: 
i.  Completion of Eleme - Onne road project, which is XX km with bridges and flyovers costing ₦156 Billion.
   ii. Eket bypass road of XXX km dualized costing ₦76 Billion 
    iii. Completion of East West Road section X which is ₦186 Billion by Setraco 
     iv. Nembe Brass  road costing ₦150 Billion. 
v)  completion of Lokoja to Benin road by four contractors costing about ₦167 Billion
vi) 2nd Niger bridge  access road in Delta XX km dualized by CCECC costing ₦146 Billion.
 Vii) completion of Bodo Bonny Road in rivers state XX km with XX bridges by julius Berger nig plc costing 200bn.
 
X. I have a duty in the coming week to publish all inherited projects and new projects that are either completed or ongoing in this present administration . 

I can say with all sense of responsibility that President Tinubu is a fair President. He has favoured the North in road development more than the South, especially North West, where Sen. Kwankwaso comes from.  

Apart from these four legacy projects, XX% of the above named ongoing projects were projects awarded by the past administration  towards the end of that administration in 2023 but never took off  effectively which President Tinubu decided to continue to fund  towards completion. If he had abandoned them, same people will complain. I have been under pressure by some stakeholders for the  construction of  their major roads like the abandoned Ibadan - Oyo by Arab contractor , Ibadan - Ife - Ilesa,  Ilesa - Akure - Benin  and Ore - Sagamu road. I have been badly accused that I am only doing projects in the North, especially North West. 

Third Mainland bridge is being closed  down to heavy  trucks because of  underwater  structural defects. The Carter bridge is so deformed that it needs to be removed and reconstructed. These are the real major projects in South West which I have been appealing to Mr President to give me money to do those projects because the people of South West may think that I am doing nothing about the major projects in their zone. 

These projects are  projects that are within major economic corridor between the South and the North and deserve attention.  Again, these bridges if allowed to further  deteriorate  will lead to serious economic consequences for the nation.  Mr president is not only fair in completion of major inherited projects/ new projects but they are all within the major economic corridor of our nation. I will publish all ongoing projects  which are above XX billion naira  each next week .  We still have many projects within the six geopolitical zones that are not listed here . In this circumstance, I don’t know where Sen Kwankwaso got his misinformation  from.
 
X. It is unfortunate that the utterances of some of our political leaders are  just intended to deceive Nigerians and gain political favour instead of making statements that will unite the country and move her forward 
 
X. I will offer more explanation on this topic and ready to face a debate with anyone just to put the records straight.
 
XX. Let me say that in the ongoing NNPCL Tax Credit roads and bridges as inherited, the North has XX% while the South has XX%  out of which South East has  only X% and South West  only 5%.  The records are there with NNPCL . Mr. President did not complain about the unfair distribution of these inherited projects  by the past administration but has continued to fund all the projects as inherited.
 
XX. To my brother, Senator Kwankwaso, you owe our  President Tinubu an apology and a duty to withdraw your statement using the information I have provided herein for the benefit of Nigerians and the unity of the nation.
 
XX I request the good people of Nigeria to ignore  senator kwakwanso misleading statement and know that President Tinubu is fairly committed to developing every part of this country with fairness, equity and the fear of God

-Sen. Engr. Nweze David Umahi, CON, FNSE, FNATE
Honourable Minister of Works

![](https://pbs.twimg.com/media/GwvFYniXMAAJhim.jpg)

XXXXXX engagements

![Engagements Line Chart](https://lunarcrush.com/gi/w:600/p:tweet::1948881388649820427/c:line.svg)

**Related Topics**
[tinubu](/topic/tinubu)
[$dave](/topic/$dave)

[Post Link](https://x.com/aonanuga1956/status/1948881388649820427)

[GUEST ACCESS MODE: Data is scrambled or limited to provide examples. Make requests using your API key to unlock full data. Check https://lunarcrush.ai/auth for authentication information.]

aonanuga1956 Avatar Bayo Onanuga @aonanuga1956 on x 118.6K followers Created: 2025-07-25 23:01:46 UTC

"President Tinubu is committed to developing every part of the country with fairness and equity" ---Minister of Works, Dave Umahi replies to Kwankwaso

STATEMENT OF SEN. KWANKWASO THAT THE NORTH IS MARGINALIZED ON ROAD INFRASTRUCTURE DEVELOPMENT UNDER PRESIDENT TINUBU’S ADMINISTRATION, ABSOLUTELY FALSE, MISLEADING AND SELF-SERVING.   My attention as Honourable Minister of Works has been drawn to the unfortunate statement by His Excellency, Sen. Kwankwaso that President Bola Ahmed Tinubu, GCFR, is developing more roads in the South than in the North.   X. I consider this statement as a grave misleading information made intentionally to deceive our brothers and sisters in the North and to pretend that he loves the North more than any other leader from the North. I consider  Sen. Kwankwaso’s statement as statement made out of desperation and as part   of his struggle  with few others who believe that they can inherit the impeccable legacy of our dear late President  Mohammadu Buhari, GCFR and that the only way available for them towards achieving same is to be divisive and pretentious. Trying to be  like  our late President Buhari cannot be a job of three decades and can not be done with deceit. I think our younger generation has such a chance and  which must be worked for through hard work, honesty, transparency and commitment to the unity of our country , a legacy that our late President Buhari, GCFR achieved in all his life on earth. May God continue to bless his legacies and give him a peaceful rest, Amen   X. For the interest of all Nigerians, especially  our  dear brothers and sisters in the North, I wish to highlight  just a few key ongoing projects in each of the six Geo-Political Zones.   X. The four legacy projects of President Bola Ahmed Tinubu, GCFR: a) Lagos-Calabar Coastal Highway, which is XXX km: As of today, a total of XXX km is ongoing within Lagos State and XX km within Cross River and Akwa Ibom States. The total ongoing is XXX km  by X lanes or XXX km by X lanes in the South. b) The Sokoto-Badagry  Superhighway, which is 1068km: As of today, we have XXX km ongoing at Kebbi section and XXX km ongoing at Sokoto section. Total ongoing is XXX km  by X lanes or XXX km by X lanes in the North. c) Trans Sahara road spanning through Cross River - Ebonyi - Benue - Kogi - Nasarawa - Abuja, which is 465km: XXX km  by X lanes or XX km by X lanes is ongoing in Ebonyi State - South. d) Akwanga - Jos - Bauchi – Gombe road, which is 439km: Project is being redesigned from flexible pavement to rigid pavement for more durable pavement as directed by Mr. President and to conform to the other legacy projects. In the four legacy projects, the North has XX% and South 48%. Within the ongoing projects as of today, the South has XXX km by 3lanes and the North has  756km by X lanes . The facts are there. I wonder why people don’t talk about other legacy projects of Mr. President but will always dwell on Lagos-Calabar Coastal Highway. This road has only XXX km by X lanes in Lagos State that is ongoing  now , crossriver and Akwaibom has 130km by X lanes that is ongoing whereas kebbi alone has XXX km by X lanes that is ongoing. Sokoto has XXX km by X lanes that is ongoing. I think Sen.  Kwankwaso is not fair to Mr.President and the unity of our country   X. The following major projects are  also ongoing in the North. a)  Sokoto - Zamfara - Katsina - Kaduna road: This is XXX km dualized (750 km), costing about ₦824 Billion. This project is being handled by CBC, Triacta, Setraco, and Mothercat. Projects are ongoing mostly on reinforced concrete pavement. Despite the insecurity within this corridor, work is ongoing. b) Abuja - Kaduna - Kano road: XXX km dualized  (700km) project is being  constructed on concrete pavement with a total sum of ₦764 Billion with Infiouest Nig Ltd and XX% of the contract sum already paid and work is ongoing. c)  BUA Tax Credit  road passing through Jigawa, Katsina, and Kano States: XXX km dualized (512 km). Project redesigned and constructed on rigid pavement. d)  XXX km of Zaria - Hunkuyi road is being constructed by mothercat Nig Ltd. e) The Kano Northern Bypass: XX km is being constructed by CCECC. f)  The XXXXX km dualized (201.8 km) Kano - Jigawa road is being constructed by Triacta. g) The Bama and Dikwa roads (49+51= XXX km) by Dangote Tax Credit are ongoing in Borno State h) The  Borno  Ring Road: XXX km is being constructed by CCECC. i)  The XX km Malando road in Kebbi State is being constructed by Episolyn Nig Ltd. j) The XXX km dualized (500 km) Benue to 9th Mile road costing $XXX Million by China Harbour is ongoing. k) The dualization of Lokoja - Okene 86km dualized (172km) by CGC is ongoing. l) The sections X and X of Kaduna to Katsina roads by CCECC costing about ₦150 Billion is ongoing.   X. Major ongoing projects in the South: a) Completion of Lagos - Ibadan XXX km costing ₦33 Billion by RCC. b) completion of Lagos to Sagamu XX km dualized (24 km) and  flyovers by CBC costing c) completion of Oyo - Ogbomoso  to Ilorin Road costing ₦146 Billion by JRB d) Repairs of Carter bridge, Third Mainland bridge, Eko bridge with total contract sum of about ₦120 Billion

e) In South East, we have:   i. Completion of Enugu - Onitsha road by MTN tax credit which is XXX km costing ₦202 Billion. ii. Completion of Enugu - Onitsha road by CBC, which is XX km costing ₦150 Billion.    iii. Enugu - Abakaliki XX km road by reinforced global resources iv) 2nd Niger bridge access road in Anambra State, XXXX km dualized with many bridges and flyovers - ₦175Billion by CGC Vii ) the completion of 61km dualized of lokpanta in Imo state to Enugu state by CGC costing 100bn

f.) In South - South: i. Completion of Eleme - Onne road project, which is XX km with bridges and flyovers costing ₦156 Billion.   ii. Eket bypass road of XXX km dualized costing ₦76 Billion     iii. Completion of East West Road section X which is ₦186 Billion by Setraco     iv. Nembe Brass road costing ₦150 Billion. v) completion of Lokoja to Benin road by four contractors costing about ₦167 Billion vi) 2nd Niger bridge access road in Delta XX km dualized by CCECC costing ₦146 Billion.  Vii) completion of Bodo Bonny Road in rivers state XX km with XX bridges by julius Berger nig plc costing 200bn.

X. I have a duty in the coming week to publish all inherited projects and new projects that are either completed or ongoing in this present administration .

I can say with all sense of responsibility that President Tinubu is a fair President. He has favoured the North in road development more than the South, especially North West, where Sen. Kwankwaso comes from.  

Apart from these four legacy projects, XX% of the above named ongoing projects were projects awarded by the past administration towards the end of that administration in 2023 but never took off effectively which President Tinubu decided to continue to fund towards completion. If he had abandoned them, same people will complain. I have been under pressure by some stakeholders for the  construction of  their major roads like the abandoned Ibadan - Oyo by Arab contractor , Ibadan - Ife - Ilesa, Ilesa - Akure - Benin and Ore - Sagamu road. I have been badly accused that I am only doing projects in the North, especially North West.

Third Mainland bridge is being closed down to heavy  trucks because of  underwater structural defects. The Carter bridge is so deformed that it needs to be removed and reconstructed. These are the real major projects in South West which I have been appealing to Mr President to give me money to do those projects because the people of South West may think that I am doing nothing about the major projects in their zone.

These projects are projects that are within major economic corridor between the South and the North and deserve attention. Again, these bridges if allowed to further deteriorate will lead to serious economic consequences for the nation. Mr president is not only fair in completion of major inherited projects/ new projects but they are all within the major economic corridor of our nation. I will publish all ongoing projects which are above XX billion naira each next week . We still have many projects within the six geopolitical zones that are not listed here . In this circumstance, I don’t know where Sen Kwankwaso got his misinformation from.   X. It is unfortunate that the utterances of some of our political leaders are  just intended to deceive Nigerians and gain political favour instead of making statements that will unite the country and move her forward   X. I will offer more explanation on this topic and ready to face a debate with anyone just to put the records straight.   XX. Let me say that in the ongoing NNPCL Tax Credit roads and bridges as inherited, the North has XX% while the South has XX% out of which South East has  only X% and South West  only 5%.  The records are there with NNPCL . Mr. President did not complain about the unfair distribution of these inherited projects by the past administration but has continued to fund all the projects as inherited.   XX. To my brother, Senator Kwankwaso, you owe our President Tinubu an apology and a duty to withdraw your statement using the information I have provided herein for the benefit of Nigerians and the unity of the nation.   XX I request the good people of Nigeria to ignore senator kwakwanso misleading statement and know that President Tinubu is fairly committed to developing every part of this country with fairness, equity and the fear of God

-Sen. Engr. Nweze David Umahi, CON, FNSE, FNATE Honourable Minister of Works

XXXXXX engagements

Engagements Line Chart

Related Topics tinubu $dave

Post Link

post/tweet::1948881388649820427
/post/tweet::1948881388649820427