[GUEST ACCESS MODE: Data is scrambled or limited to provide examples. Make requests using your API key to unlock full data. Check https://lunarcrush.ai/auth for authentication information.]

$xbuzzcoin

Top Social Posts

Showing only X posts for non-authenticated requests. Use your API key in requests for full results.

"@BarackObama How did Kamala get picked It wasnt by voters in the primaries. How did Biden get picked Bill Clinton (1992): 44909889 Barack Obama (2008): 69498516 Joe Biden (2020): 81284000 Donald Trump (2016): 62984828 Donald Trump (2020): 74223"
X Link @XBUZZCoin 2025-10-23T01:35Z XXX followers, XX engagements

"Stop your crying Hes building back better You liked build back better not too long ago 🤣 East Wing Renovation Details (2025): Project: Demolition of East Wing facade for 90000 sq ft expansion including 25000 sq ft ballroom for 650-1000 people formal dining for XXX bulletproof glass and inauguration capability. Modernizes historic East Wing (built 1902 renovated 1942). Timeline: Announced July XX 2025; construction began September; demolition October XX 2025; completion before 2029. Cost: $200-250M privately funded by Trump and donors. Status: Facade torn down by excavator; East Wing offices"
X Link @XBUZZCoin 2025-10-21T00:54Z XXX followers, XXX engagements

"Yep Building bigger and better without a single dime of cost to you or me Amazing East Wing Renovation Details (2025): Project: Demolition of East Wing facade for 90000 sq ft expansion including 25000 sq ft ballroom for 650-1000 people formal dining for XXX bulletproof glass and inauguration capability. Modernizes historic East Wing (built 1902 renovated 1942). Timeline: Announced July XX 2025; construction began September; demolition October XX 2025; completion before 2029. Cost: $200-250M privately funded by Trump and donors. Status: Facade torn down by excavator; East Wing offices (First"
X Link @XBUZZCoin 2025-10-21T00:36Z XXX followers, XX engagements

"With approval East Wing Renovation Details (2025): Project: Demolition of East Wing facade for 90000 sq ft expansion including 25000 sq ft ballroom for 650-1000 people formal dining for XXX bulletproof glass and inauguration capability. Modernizes historic East Wing (built 1902 renovated 1942). Timeline: Announced July XX 2025; construction began September; demolition October XX 2025; completion before 2029. Cost: $200-250M privately funded by Trump and donors. Status: Facade torn down by excavator; East Wing offices (First Ladys) relocated; South Lawn prep ongoing"
X Link @XBUZZCoin 2025-10-21T00:35Z XXX followers, XX engagements